Renovation
South Bartell
Houston, Texas
shoring, demolish, framing, stucco, lightweight concrete
Fire damage building reconstruction - We Provided emergency structural support by installing shoring to stabilize the existing roof system. Performed selective demolition of approximately half of the unit, including removal and disposal of fire-damaged and charred framing members. Furnished and installed new structural framing where required to restore integrity.
Completed full reconstruction of one exterior balcony, including installation of waterproofing system and placement of lightweight concrete. Installed lightweight concrete within affected interior unit areas as needed. Performed exterior stucco repairs and restoration to match existing finishes.
Completed full reconstruction of one exterior balcony, including installation of waterproofing system and placement of lightweight concrete. Installed lightweight concrete within affected interior unit areas as needed. Performed exterior stucco repairs and restoration to match existing finishes.
Project gallery
Demolition
Shore up the roof with supports from the first floor, demolish the remaining portion of unit 7, 27, and 37
Framing
Build back the unit 7, 27, and 37 from first floor to 3rd floor.
Lightweight concrete
Pour lightweight concrete in unit 27, and 37. Poured lightweight at the patio
Stucco
Install moisture barrier/ lath, apply scratch coat, apply brown coat, apply finish coat